Projects implemented

مName of ProjectCityDescription of WorkOwner name 
1 Shotcrete works to covering secant piles surface for a cinema project.DammamApply one layer of shotcrete (installation of a galvanized wire mesh with a layer of spraying of ready-mix concrete) to level the surface of the secant pile and prepare it for the insulation works. 
2 support using the micro piles for Maintenance Workshop.RiyadhImplement micro-piles with a 6-inch diameter and 7-meter-long to transport loads from weak soil to higher-bearing soil. 
3 Strengthening A hotel using concrete Jacketing for columns.Riyadh.Strengthening columns by enlarging some sections using the concrete Jacketing system. 
4 Private villas.DammamThe process is cementation soil injection to fill voids and supporting soil and foundation. 
5 Clinics group in Riyadh.RiyadhCreate new system to reduce groundwater level then starting with concrete repair and jacketing for columns,raft foundation and retaining walls. 
6 Soil injection for Al Khouzama palace.RiyadhInjection of soil cements material to fill the voids in the soil, The injection points were drilled with a diameter of 3 inches and a depth of 10 meters,The injection points are distributed as a net every 3 meters for area 5000 m2 . 
7 Repair, Insulation and Maintenance Station for Saline Water Conversion Corporation.QassimFirst, finish all concrete repairs. Second, inject the cracks and treat the joints, and then perform the epoxy insulation after the surface is processed and prepared well.Saline Water Conversion Corporation.
8 Compound Villas for the Ministry of Housing Bahrain.BahrainInjection of soil cement material to fill the voids in the soil, the depths of injection reaches up to 3.5 meters.Ministry of Housing Bahrain
9 Concrete repairs .RiyadhConcrete repairs after crushing all weak concrete until reaching the strong concrete and ending the problem of rusting the steel through sandblast or replacing it when needed with the use of special repair materials from a specialized company.General Organization of Ports.
10 Strengthening 5 schools using the Carbon Fiber System (CFRP).Qassim.Reinforcing elements by using a carbon fiber System (CFRP) to increase the durability of structural elementsMinistry of Education
11 Renovation, isolation and maintenance of the National Water Company's tank.OtherFirst finish all concrete repairs, second inject the cracks and treat the joints, and then perform the epoxy insulation after the surface is processed and prepared well 
12 Strengthening of 2 large gymnasiums using the Carbon Fiber System (CFRP).Riyadh.Strengthening the required elements by using a carbon fiber chip system (CFRP) to increase the durability of structural elements 
13 compound villas in the north of RiyadhRiyadhThe process is cementation soil injection to fill voids and supporting soil and foundation 
14 support using the micro piles for Riyadh Metro.Riyadh.Implementation of Micro piles with a 6-inch diameter and 10-meter-long to transport loads from weak soil to higher-bearing soil 
15 Treatment of the cracks and the landing of the building of the comprehensive rehabilitation center in Tabuk through concrete Jacketing for the Foundation.Tabuka change of the structural system of the separate foundations and replace them with another system by reloading the building on new foundations connected with the preservation of the building on its condition without effect.Ministry of Social Affairs
123