Soil injection of the Public Prosecution building

Soil injection of the Public Prosecution building

The building was injected below the foundations to ensure its stability and prevent subsidence.
The injection was carried out in successive stages according to a pre-determined grid, with injection volumes and pumping pressures continuously monitored to ensure even distribution and consistent results.